Buyer Guide · 05

How to Prepare a Clothing Manufacturing Brief Without a Tech Pack

You have a design and want a price from factories — but no technical package. Here is exactly what to send instead, and how a clear brief gets you a faster, more accurate quotation.

What a factory actually needs to quote

A tech pack is the industry standard for instructing a factory, but most new brands do not have one at inquiry stage — and that is fine. What a factory needs to price your style is information, not a specific document format. A short brief that answers the right questions beats a long document that answers the wrong ones.

Before contacting suppliers, pull together what you already know:

  • Product category and reference design — photos, sketches or screenshots, and what you want to keep or change about them.
  • Approximate measurements — garment length, chest and sleeve for your mid size, or simply “match size M of the attached reference”.
  • Fabric direction — knit or woven, composition and weight in GSM if you know them.
  • Colors and decoration — colorway plans and print or embroidery placement.
  • Estimated quantity — how many pieces across which sizes.
  • Target market — it affects fabric compliance, labeling and trims.

You do not need every answer on day one. But the more you provide, the tighter the first estimate — and the fewer assumptions a factory has to make on your behalf.

A brief is intent — a tech pack is execution

The difference matters because new brands often freeze at the words “tech pack”. A brief communicates what you want to achieve: the look, the fit, the fabric feel, the order size. A tech pack specifies exactly how to make it: graded measurement tables, stitch types, constructions, artwork files, bills of materials.

The tech pack does not have to exist before sampling — in practice, it is developed during product development, not before it.

At Mano Garment, building the factory-ready specification from your brief is part of our product development work: our team converts reference images, measurements and comments into the documents a partner factory needs before cutting a single sample.

No tech pack? Send what you have — reference images, a rough measurement list and your quantity. Turning that input into factory-ready specifications is our job, not yours.

The five mistakes that slow quotations down

  • Reference photos without direction. “Make it like this” does not say which part to keep — neckline, fabric, fit or proportions? Say what to keep and what to change.
  • No key measurements. A photo cannot communicate fit. Even two or three measurements anchor the whole quotation.
  • No quantity. 50 pcs and 500 pcs of the same style are different productions with different economics — price is impossible without a number.
  • Fabric described by look only. “Soft, nice quality” means different fabrics to different factories. Name the weight, the composition, or attach a swatch.
  • Silence on branding and packaging. Labels, hangtags and packing method all affect cost and timeline — flag them early, even if the artwork is not ready.

A brief template you can copy today

Copy this into an email or a one-page PDF — no special format is needed:

Style name & product type: e.g. “Ava — puff-sleeve midi dress”
References: 2–3 images + what to keep / what to change
Measurements: length / chest / sleeve for size M, or “match reference”
Fabric: knit or woven, composition and GSM if known, or “please advise”
Colors: colorway list or reference photos
Print / embroidery: placement, size, artwork status
Branding: main label, care label, hangtag — artwork ready or not
Quantity & size ratio: e.g. 100 pcs across S/M/L
Target market: e.g. EU
Budget / target price: optional, but it helps us propose the right construction
Deadline: when you need the goods delivered

The quantity line and the deadline line are the two buyers forget most — and the two a factory cannot plan without.

What happens after you send the brief

A good sourcing team will come back with a feasibility check and a price estimate within 24 hours, ask the open questions before sampling starts rather than after, and follow with a firm quotation once the details are confirmed.

From there, development runs on the sample stages: a first proto sample in roughly 5–7 days, fit rounds after that. If you want the full picture of what each sample stage checks, see our sample approval process guide; for how to compare the quotations that come back, see what a quotation includes.

Final Thoughts

A brief is not a lesser document than a tech pack — it is the input that starts development. The brands that get fast, accurate quotations are rarely the ones with the fanciest paperwork; they are the ones that answer the right questions up front.

At Mano Garment we work from briefs, sketches, reference garments or full tech packs — and the development team turns whichever you have into factory-ready specifications.

Have a design but no tech pack?

Send your reference images, measurements and quantity — feasibility check and price estimate within 24 hours.

Follow us